whats_next.info_banner.title

TURNKEY HOUSE CONSTRUCTION

TURNKEY HOUSE CONSTRUCTION
TURNKEY HOUSE CONSTRUCTION
TURNKEY HOUSE CONSTRUCTION
TURNKEY HOUSE CONSTRUCTION
TURNKEY HOUSE CONSTRUCTION
TURNKEY HOUSE CONSTRUCTION

Share

FacebookFacebook
Zalo
1,000 - 3,000 m²
14,238,000
3,001 - 6,000 m²
14,039,000
6,001 - 12,000 m²
13,900,000
> 12,000 m²
Negotiable
Variants (1)TURNKEY HOUSE CONSTRUCTION
TURNKEY HOUSE CONSTRUCTION
Quantity
Compare price

Brand

LONG THINH COMPANY LIMITED

Service Name

TURNKEY HOUSE CONSTRUCTION

Unit of measure

m2

Receive processing

Yes

Minimum Order Quantity (MOQ)

500 m²

Provide samples

No

Product Condition

100% New

Main Export Market

Vietnam

Product Certificate

ISO 9001 - International Quality Management System

Packaging

Packaging type

Packaging Detail

Cement: Paper/PP bags (50kg), sealed, neatly stacked, covered. Sand, gravel: Trucks/dump trucks (covered), or bags (secure). Bricks: Bundles (steel/plastic straps), neatly stacked, tiles are lined. Steel: Bundles (steel straps), strapped

Packaging dimensions (length x width x height)

1 m x 1 m x 1 m

Packing weight

50 kg

B2B Sales Policy

· Ensuring materials and equipment are transported to the construction site on time, in the right quantity, and of the right quality.

· Taking responsibility for any risks and damages that occur during transportation.

· Ensuring occupational safety and complying with legal regulations.

· Notification: Customers notify Long Thinh Company in writing of any problems that arise (delays in progress, poor quality,...).

· Verification: Long Thinh Company will send someone to check and verify the information.

· Negotiation: Both parties will negotiate to agree on the level of compensation and the solution.

· Compensation: Long Thinh Company will compensate the customer as agreed. The form of compensation can be cash, deduction from the price

· Stage 1: Deposit (usually 5-10% of the contract value)

· Stage 2: Completion of the foundation (usually 20-30% of the contract value)

· Stage 3: Completion of the rough construction (usually 40-50% of the contract value)

· Stage 4: Completion of finishing (usually 15-20% of the contract value)

· Stage 5: Acceptance and handover (usually 5-10% of the contract value)

TT/LC

Detailed description

1. Scope of work includes:

  • Consulting and design:

    • Consulting: Meeting and discussing with the investor to understand needs, desires, preferences, and budget.

    • Survey: Surveying the construction site, assessing geology, topography, and the existing structure (if any).

    • Architectural design: Developing ideas, sketches, creating 3D perspectives, and completing detailed architectural drawings.

    • Structural design: Calculating load-bearing structures to ensure the safety and stability of the structure.

    • Electrical and plumbing design: Designing electrical, water supply and drainage, and communication systems.

    • Interior design (optional): Designing interior layouts, selecting materials, and colors that suit the investor's style and preferences.

    • Obtaining construction permits: Assisting with or directly handling construction permit procedures.

  • Rough construction: (As described in the rough house construction service, including):

    • Site preparation.

    • Foundation construction.

    • Construction of the main structure (columns, beams, floors, walls, stairs).

    • Roof construction.

  • Finishing:

    • Plastering, puttying, painting: Finishing the interior and exterior wall surfaces.

    • Tile laying: Laying floor tiles, bathroom and kitchen walls, facade...

    • Installation of sanitary ware: Toilets, lavabos, showerheads, faucets...

    • Electrical installation: Sockets, switches, lighting, fans...

    • Door installation: Main doors, windows, room doors (including locks and accessories).

    • Water supply and drainage installation: Water pipes, water tanks, water pumps (if any).

    • Ceiling construction: Gypsum board ceilings, plastic ceilings, wooden ceilings...

    • Basic interior installation (optional): Kitchen cabinets, wardrobes, TV shelves...

    • Industrial cleaning: Thorough cleaning of the entire structure after completion.

  • Acceptance and handover:

    • Acceptance of each item of work and the entire project.

    • Handover of the project to the investor.

    • Instructions on the use of equipment.

    • Providing completion documents.

2. Materials used:

  • Raw materials: (Cement, sand, gravel, bricks, steel, concrete...) - Using high-quality materials from reputable brands.

  • Finishing materials: (Tiles, paint, sanitary ware, electrical equipment, doors...) - The investor can choose the type and brand of materials within a certain price range or authorize the contractor to choose according to requirements.

  1. 3. Advantages of turnkey house construction services:

  • Save time and effort: Investors do not need to directly participate in the construction process, saving a lot of time and effort.

  • Cost control: Construction costs are clearly defined from the outset, helping investors easily control their budget.

  • Quality assurance: The quality of the construction is strictly controlled by skilled engineers and workers.

  • Risk mitigation: Reducing risks arising during construction (technical errors, poor quality materials...).

  • Warranty: The project is warranted for a certain period, ensuring the investor's rights.

  • Convenience: Receive a completed house, ready to move in immediately.

Technology - Production Process

  • Receiving information

  • Survey and consultation

  • Quotation

  • Signing the contract

  • Design

  • Construction

  • Acceptance

  • Handover

You have selected0 variants
You haven't selected any products
product-detail-rfe-banner

Can't find the product you're looking for??

Share your needs with suppliers and receive direct quotes using Arobid RFQ!

Home

Categories

RFQs

Suppliers

Account