whats_next.info_banner.title

Pre-engineered Steel Building

Pre-engineered Steel Building
Pre-engineered Steel Building
Pre-engineered Steel Building
Pre-engineered Steel Building
Pre-engineered Steel Building
Pre-engineered Steel Building

Share

FacebookFacebook
Zalo
1 - 3 service
999,800,000
4 - 7 service
999,500,000
8 - 10 service
999,000,000
> 10 service
Negotiable
Variants (1)Prefabricated Steel House
Prefabricated Steel House
Quantity
Compare price

Brand

ATAD

Grade / Type / Style

Pre-fabricated Steel House

Receive processing

No

Minimum Order Quantity (MOQ)

1 service

Provide samples

No

Product Condition

100% New

Main Export Market

Vietnam

Packaging

Packaging type

service

B2B Sales Policy

Standard shipping

1:1

100%

TT/LC

Detailed description

Pre-engineered steel buildings are constructed from 3 interconnected components:

  • Main components: columns, rafters, braces...

  • Secondary components: C or Z purlins, wall top bracing, wall beams...

  • Roof and wall sheeting: roof sheets, wall sheets...

  • Other accessories

Pre-engineered steel

Cái Mép Project

All processes of producing main and secondary structures including: cutting, punching, drilling, welding and shaping are completed in the factory before being transported to the construction site.
At the construction site, the components will be assembled and connected together by bolts. This helps to save costs and minimize installation time.

Pre-engineered building is also very flexible in adding other structural accessories such as wall lights, exhaust fans, ventilation fans, doors and windows, rafters, mezzanine floors, awnings, crane systems, insulation, etc... based on diverse customer requirements.

Model of pre-engineered steel building

Model of pre-engineered steel building
Why choose pre-engineered buildings?
1. Cost savings

The cost of a pre-engineered steel building can be up to 25% lower per square meter (m2) compared to traditional methods. Installation costs will be very low because the installation time is fast and simple.

2. Guaranteed quality

Steel components are designed and manufactured at the factory with a strict, continuous quality control process from the beginning to the construction site.

3. Fast installation

All steel components are manufactured at the factory and assembled using bolted connections at the construction site. Therefore, the installation process is fast, simple with lightweight equipment.

4. Flexibility

Pre-engineered buildings are completely easy and flexible in expanding the scale or dismantling and installing at a new location at an appropriate cost

5. Energy efficiency

Pre-engineered steel buildings are a “green” solution for the environment by reducing CO2 emissions, saving energy and effective recycling.

You have selected0 variants
You haven't selected any products
product-detail-rfe-banner

Can't find the product you're looking for??

Share your needs with suppliers and receive direct quotes using Arobid RFQ!

Home

Categories

RFQs

Suppliers

Account